Bore installations

Bore installations

Bore installations typically take a day to install, depending on the soil we have to drill into. WBS will drill 10m past depth to water to maximise the volume of water your bore will produce. Once the hole has been drilled, casing will be inserted down the hole. WBS use Australian Standard Class 9 bore casing. Gravel Pack will then surround the casing to minimise sand from entering the bore. A submersible pump will then be installed at the base of the bore which will push water to the surface when required.

Please see diagram

At the end of the day, Water Bore Specialists will connect the bore to your existing retic with all that remains to be seen is a small plastic lid about the size of an A4 sheet of paper. Even this can be hidden under paving, grass or garden beds.


Need a Water Bore Specialist? Contact Us